Printed from www.nzmeccano.com
84 - M5180-84.jpg
Issue 84 is available.
It adds 14 three-hole flat girders between the two boom segments on one side of the crane.
4 flat girders are placed between the vertical angle girders (A). The other 10 connect the perforated strips (B) by means of angle brackets.
In the magazine :
- History of Meccano : Return of the red-green period in England
- History of Meccano parts : the one-inch pulley (part 5 : Tyres and rings)
- Other models
Log in to the gallery
If you have any interesting information or comments about this page, please add them here: